What Are Florida’s Construction Defect Laws?

Florida homeowners and property owners who discover construction defects have legal options, but those options come with strict procedural requirements and deadlines. The two primary laws governing construction defect claims are Chapter 558 of the Florida Statutes (the pre-suit notice and cure process) and the statute of limitations and repose provisions under Section 95.11, Florida Statutes. Missing a deadline or skipping a required step can result in your claim being dismissed, stayed, or permanently barred.

Chapter 558, often called Florida’s “notice and right to cure” law, requires property owners to serve written notice on the responsible party before filing a lawsuit. This pre-suit process gives contractors, subcontractors, suppliers, and design professionals an opportunity to inspect the defect and either repair it or offer a settlement before litigation begins. The law applies to both residential and commercial construction projects, and courts have consistently enforced the requirement that owners must complete this process before filing suit.

Understanding both the procedural requirements and the filing deadlines is critical. If you suspect a construction defect in your Florida property, consulting an attorney early helps ensure you follow the correct process and preserve your right to seek compensation.

What Qualifies as a Construction Defect Under Florida Law?

Section 558.002, Florida Statutes, defines a construction defect broadly as a deficiency in the design, specifications, surveying, planning, supervision, observation of construction, or construction, repair, or alteration of real property. Common examples include water intrusion through improperly sealed windows or roofs, foundation cracks caused by inadequate soil preparation, faulty plumbing or electrical systems, structural framing deficiencies, mold damage resulting from moisture intrusion, and failure to comply with applicable building codes.

The defect does not need to be visible at the time of purchase or move-in. Many construction defects are latent, meaning they only become apparent months or years after completion when water damage appears, cracks develop, or systems fail. Florida law recognizes this reality by providing specific timelines for when claims can be brought after a defect is discovered.

What Is the Chapter 558 Pre-Suit Notice Process?

Before filing a construction defect lawsuit in Florida, property owners must comply with the mandatory pre-suit notice requirements under Section 558.004. Skipping this step can result in the court staying your lawsuit until you complete the process.

The property owner must serve a written notice of claim on the contractor, subcontractor, supplier, or design professional responsible for the alleged defect. This notice must describe each defect in reasonable detail, identify the location of each defect clearly enough for the responsible party to find it, and describe the damage or loss resulting from the defect, if known. The notice should be based on at least a visual inspection. The owner is not required to perform destructive testing for purposes of the notice.

For residential projects involving more than 20 units, the responsible party has 50 days after receiving the notice to inspect the property and 15 additional days (75 days total) to serve a written response. For projects with 20 or fewer units, the responsible party has 30 days to inspect and must respond within 45 days total. The response must state whether the party will make repairs, offer a monetary settlement, or dispute the claim.

If the responsible party offers to repair the defect, the owner can accept or reject the offer. If the offer is rejected, the owner may then proceed with filing a lawsuit. If the responsible party fails to respond within the required time, the owner can move forward with litigation. The entire pre-suit process typically takes 60 to 120 days depending on the size of the project.

Communications during the Chapter 558 process are generally confidential and not admissible in court. Any offer to repair or settle during the process does not constitute an admission of liability.

What Are the Deadlines for Filing a Construction Defect Claim?

Florida imposes two separate time limits on construction defect claims, and both must be satisfied for a claim to proceed.

Statute of limitations (4 years). Under Section 95.11(3)(c), a property owner generally has four years from the date the defect is discovered or should have been discovered to file a construction defect lawsuit. This is the statute of limitations, and it begins running when the owner knows or reasonably should know about the defect.

Statute of repose (7 years). Florida Senate Bill 360, effective April 13, 2023, reduced the statute of repose for construction defect claims from 10 years to 7 years. The statute of repose is an absolute deadline that runs from a triggering event regardless of when the defect is discovered. Under the current law, the triggering events include the issuance of a temporary or final certificate of occupancy, a certificate of completion, or the date the project is abandoned, whichever comes first. Once 7 years have passed from the triggering event, no construction defect action can be filed, even if the defect was only recently discovered.

This change to the statute of repose is significant because latent defects, particularly water intrusion and structural issues, often take years to become apparent. Property owners who discover defects approaching the 7-year mark must act quickly to preserve their claims.

A notice of claim served under Chapter 558 tolls the statute of limitations but does not toll the statute of repose. This means the Chapter 558 pre-suit process does not extend the 7-year absolute deadline. Property owners should serve notice early enough to complete the pre-suit process and file suit within the repose period if necessary.

Does the Contract Need to Reference Chapter 558?

Yes. Under Section 558.005(6), any written contract for improvement of real property entered into after October 1, 2009, between an owner and a contractor or design professional must include a notice stating: “ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER 558, FLORIDA STATUTES.”

The statute clarifies that the failure to include this notice does not create a penalty for either party. The purpose is to promote awareness of the pre-suit process, not to penalize noncompliance. However, the absence of this language does not exempt the parties from Chapter 558’s requirements. Unless the parties have expressly agreed in writing that Chapter 558 does not apply, the pre-suit notice and cure process remains mandatory.

Parties can contractually opt out of Chapter 558, but only for completed projects. The opt-out must be explicit and in writing. Without a clear written waiver, courts will enforce the pre-suit requirements.

What Remedies Are Available for Construction Defects in Florida?

Property owners who successfully pursue construction defect claims can recover several types of damages depending on the nature and extent of the defect.

Cost of repair. The primary remedy is the cost to repair or correct the construction defect. This includes all labor, materials, and related expenses necessary to bring the construction into compliance with applicable building codes and contract specifications.

Diminution in value. If the defect cannot be fully repaired or if repair would be disproportionately expensive compared to the property’s value, the owner may recover the difference between the property’s value as built and its value had it been constructed properly.

Consequential damages. Owners may also recover damages for losses caused by the defect, such as temporary housing costs during repairs, damage to personal property from water intrusion, mold remediation expenses, and lost rental income if the property was an investment.

Attorney fees. Florida follows the “American rule” for attorney fees, meaning each party generally pays its own legal costs unless a contract or statute provides otherwise. Many construction contracts include prevailing-party attorney fee provisions. If your contract includes such a clause, the party that wins the dispute can recover its reasonable attorney fees from the losing party.

What Should You Do if You Discover a Construction Defect?

Act quickly. Document the defect with photographs, video, and written descriptions. Note when you first observed the problem and any conditions that may have contributed to it. Keep all construction-related documents, including your contract, plans, permits, inspection reports, and warranty information.

Do not attempt repairs before the responsible party has had an opportunity to inspect. Under Chapter 558, the contractor has the right to inspect the property and propose a remedy. Making repairs before completing the pre-suit process can limit your ability to prove the defect existed and to recover the full cost of correction.

Contact an experienced construction attorney before sending your Chapter 558 notice. The notice must be detailed enough to meet statutory requirements, and an improperly drafted notice can delay your claim. An attorney can also evaluate whether your claim falls within the statute of limitations and repose, identify all potentially responsible parties, and advise you on whether to accept or reject any repair or settlement offers.

How Can Ilabaca Law Help With Construction Defect Claims?

Construction defect cases involve technical building issues, strict procedural requirements, and multiple potentially responsible parties. Whether you are a homeowner dealing with water intrusion, a condo association facing structural deficiencies, or a commercial property owner with code violations, Ilabaca Law can help you navigate the Chapter 558 process and pursue the compensation you are owed.

Call (407) 917-2087 to schedule a consultation and discuss your construction defect claim.


This blog post is for informational purposes only and does not constitute legal advice. Every case is different, and outcomes depend on the specific facts and circumstances involved. If you need legal assistance, contact Ilabaca Law at (407) 917-2087 to schedule a consultation.

Worried about your immigration case?

Get a Board Certified review of your situation

Start a confidential pre-evaluation with our office. We help clients in all 50 states and explain your options in plain language.

Start Pre-Evaluation

or call (407) 917-2087


5.0 · 150+ Google reviews

Confidential · Se habla español

Newsletter

Know your rights. Get them in your inbox.

Plain-language updates on Florida insurance claims, accident law, and immigration. One email a month.

No spam. Unsubscribe anytime.

Need legal help in Florida? Free pre-evaluation for immigration · Free consultation for injury & insurance claims